Levels Calculated For You
Enter B.S., I.S. and F.S. readings from the TBM, and the H.I. and R.L. of every left, centre and right point are calculated automatically.
Turn road survey levels into layer quantities and billing.
Enter B.S., I.S. and F.S. readings, and every H.I. and R.L. is worked out for you.
Turn road survey levels into layer quantities and billing: reduced levels, earthwork, GSB, WBM and side shoulder quantities, gutter and approved cutting, with level and billing data exported in one step.
Enter B.S., I.S. and F.S. readings from the TBM, and the H.I. and R.L. of every left, centre and right point are calculated automatically.
Create the chainages and offset rows for each layer from the start, interval and last chainage and the number of points on each side.
Calculate embankment and cutting from the actual initial ground survey, or from an assumed initial surface built from the final level when no survey exists.
Earthwork, GSB, WBM first, second and third, and side shoulder quantities, each calculated by its approved layer method and rounding.
Add gutter excavation, and take approved cutting as computed, rounded or manually approved, with the contract's cutting deduction percentage.
Duplicate or backward chainages, mismatched point counts and non numeric offsets are caught before the quantities are refreshed.
Chainage wise area, mean area, length and quantity for each layer, net earthwork after deductions, and billing sheets linked to every result.
Export the selected level and billing sheets to separate files, in date order, with one click.
It turns road survey levels into quantities. Enter back sight, intermediate sight and fore sight readings, and it calculates the height of instrument and reduced levels, then the earthwork, GSB, WBM and side shoulder quantities, gutter and approved cutting, and billing sheets ready to export.
Earthwork can be calculated from an assumed initial surface built from the final level and your approved range. When the actual initial survey is available, select it instead and embankment and cutting are calculated chainage by chainage from real levels.
Earthwork, GSB, WBM first, second and third, and side shoulder, each with its approved method, reference sheet and rounding, plus a spare layer for future use.
A validator checks for duplicate or backward chainages, mismatched point counts between the initial and final levels, and non numeric offsets, and the quantities are refreshed only after the inputs pass.
Yes. Selected level sheets and billing sheets export to separate files with one click, arranged in date order.
A one-time purchase, a single-PC perpetual license that works fully offline after a one-time activation. There is no subscription.
Save on every product, plus an extra 10% off orders of ~$259.39 or more.